Go Back > Guide Lower Outlet Trash Rack into Place
In this project, a crane lowers a lower outlet trash rack at a hydro electric dam as the ROV maneuvered it into place. The ROV worked at a depth of over 200 feet in a mountain reservoir high above sea level. After the rack was latched, visual inspection verified that the rack was placed properly and secured.