ROV in cage ready to be lowered into water for inspection.
The head gate seal plate was missing from one of several units on a hydro electric plant. A visual inspection tallied how many bolts were missing, broken, or in place. The ROV also descended into the penstock and into the unit's scroll cage to verify that the missing seal plate was not inside the unit, thus endangering the wicket gates.